top of page

Wind Power Made Efficient in French Guiana

ARE was employed to provide manufacturing, logistics, and installation of 4 patent-pending Direct Embedment Monopole.

frenchguiana.jpg

The need

ARE Telecom was contracted by a private company in coastal French Guiana to provide design consulting, manufacturing, logistics, and installation of 4 patent-pending Assembled Foundation Systems with monopoles for a wind power project.

Overview

ARE Telecom created a AFS 1700 ballasted foundation that would support a 30 m wind tower with a 20kW hummer wind turbine. Due to the unknown soil conditions of the site, the foundation and monopole solution was designed to utilize flexible and reusable equipment, accommodate below grade installation requiring no concrete, exceed the wind requirements for tower and turbine stability.

Project Benchmarks

  • Crew flexibility and equipment availability allowing for installation under challenging conditions

  • Leverage local soil for ballast

  • On-site technical installations

Project Resources

  • 3-person crew

  • 1 day

  • Skid-steer

  • Telehandler

Challenges

  • Limited space and access

  • Significant logistics planning

  • Quickly and efficiently deployed in 1 day

CONTACTS

Piling Latvia, Drilling rigs, Bored piles

TILTS SIA

 

Registration number: 50103005351

Adress: Spilves street 18, Riga, LV 1055, Latvia

Bank: OP Corporate Bank plc Latvia

SWIFT code: OKOYLV2X

Bank account number.: LV82OKOY0005100035077

To receive a quote or any other information related to your individual project, please contact our specialists by phone or email

bottom of page