top of page

INDUSTRIAL CONSTRUCTION

_DSC0176.jpg

HES CONSTRUCTION

The company has carried out reconstruction works in all the largest hydroelectric power plants in Latvia:

Pļaviņu HPP, Ķeguma HPP, Riga HPP, Aiviekste HPP, as well as in several HPPs in Estonia.

Compared to other objects, the restoration of HPP has much more complicated engineering conditions, for example, shore strengthening, shutter replacement and concrete replacement works. Successful implementation of such ambitious projects confirms the high professionalism of the company and the level of organization of work processes. These structures do not allow delays in construction deadlines and the construction company TILTS has always been able to meet the deadlines set by the customer, strengthening an impeccable reputation in the performance of such works. 

The opportunity to see in pictures what TILTS has done after the complex engineering works:

  • Plāviņu HPP

  • Kegum HPP

  • Aviekste HPP

INDUSTRIAL BUILDINGS

By combining excellent industry professionals and extensive technical support, TILTS SIA is able to realize the construction of complex buildings of concrete and metal structures. Using our extensive experience in bridge construction, we are able to replicate specialist works such asas concreting and assembly of metal structures works in industrial buildings. Thanks to the competence of TILTS SIA, we ensure the use of new technologies in building construction, thereby  speeding up the construction process itself without losing quality. 

We offer full-cycle development of industrial projects, starting with project development, application of appropriate technologies and the construction process itself, according to the highest standards, strictly observing building regulations, deadlines and their quality.

A unique technology in Latvia was used in the specific project - the sliding (climbing) mold that operated with hydraulic lifts.

The total height of the building is 40 meters and by continuous concreting, we were able to create 1.5 meters during the day. Concreting works were carried out continuously, around the clock and the project was realized in 27 days. 

CHECK OUT OUR OTHER SERVICES

Tiltu būvniecība

Bridge construction

Skaņas barjeri

DeltaBlocks

Tilts

Projects

dzelzbetons

Reinforced concrete structures

Urbpāļu izbūve

Construction of bored piles

Metāla konstrukcijas

Metal constructions

Ziedoņdārza labiekārtošana

Landscaping

Armarūra

Reinforcement constructions

CONTACTS

Tilts logo

SIA TILTS

Registration number: 50103005351

Address: Spilves iela 18, Riga, LV 1055, Latvia

Bank: OP Corporate Bank plc Latvia

SWIFT code: OKOYLV2X

Bank account number: LV82OKOY0005100035077

bottom of page