The need

Northwest Towers was in need to install several poles across Cote Mine. One of the key challenges faced by Cote Mine was establishing a robust and reliable communication network across their expansive mining site. They were in need of a solution that could provide stable support for their communication equipment, withstand harsh weather conditions, allow for easy installation and maintenance, and a system that allows for relocating as mining locations change.

Overview

Thanks to ARE Telecom’s expertise and innovative solutions, Northwest Tower deployed 7 AFS 350 systems to provide stable and reliable communication throughout the mine. This has improved safety, coordination, and productivity resulting in more efficient mining operations.

Project Benchmarks

  • Pre-assembled in ARE yard resulted in fast installation and less time installing during winter months

  • Above ground foundation required no digging

  • Customization and flexibility

  • Permanent or temporary

Project Resources

  • 2-man crew

  • 1 day

  • Telehandler

Challenges

  • Limited space and access

  • Need to relocate system

  • Extreme weather conditions

  • Highly regulated Canadian Mine industry standards

CONTACTS

Piling Latvia, Drilling rigs, Bored piles

TILTS SIA

 

Registration number: 50103005351

Adress: Spilves street 18, Riga, LV 1055, Latvia

Bank: OP Corporate Bank plc Latvia

SWIFT code: OKOYLV2X

Bank account number.: LV82OKOY0005100035077

To receive a quote or any other information related to your individual project, please contact our specialists by phone or email

© TILTS SIA 2024 

Powered by Tukii

  • Facebook
  • LinkedIn
bottom of page